Wendor site intelligence
Location Suitability Checker
Evaluate a potential site using demand, economics, access, and operational reliability signals.
Suitability score
0/100
Pending analysis
- Demand score
- 0
- Economic score
- 0
- Operational score
- 0
Explore Tools
Switch between planning tools
Operator Playbook
Use location scoring as a launch decision framework
- Compare at least two site options before finalizing the first machine.
- Treat footfall quality and operating hours together, not separately.
- Validate rent burden and refill access before commercial sign-off.
- Re-score site after first 30 days using real transaction data.
Pre-Launch Checklist
Validate these before approving a location
- Site footfall windows are verified by observation, not assumptions.
- Commission/rent burden is within your unit economics threshold.
- Cashless payment readiness and machine safety are confirmed.
- Refill access, parking, and service turnaround are practical.
Next Step
Match the shortlisted location with the right machine setup
After finalizing the score, choose machine format and inventory depth that fit the site profile and demand behavior.
Execution Framework
Use a phased rollout workflow
-
Phase 1
Score shortlisted locations
Evaluate at least two candidate locations and compare score spread before locking a pilot.
-
Phase 2
Validate on-ground constraints
Confirm access windows, safety, power, and refill practicality before commercial sign-off.
-
Phase 3
Launch and re-score
Re-check score after 30 days using actual demand behavior to refine expansion decisions.
High-Value Use Cases
Where this tool adds the most value
-
Office and business parks
Prioritize entries with stable weekday demand and predictable operating windows.
-
Residential and community clusters
Validate late-hour demand, service access, and security before installation.
-
Transit and public footfall zones
Compare volume potential against refill frequency and operating complexity.
Performance Tracking
KPIs to monitor after launch
-
Location score conversion rate
Track how many evaluated locations become approved launches.
-
Score-to-launch cycle time
Reduce delays between scoring and commercial decision.
-
Post-launch score stability
Re-check score using first-month data to validate site quality.
Decision Benchmarks
Use benchmark bands before approval
-
Target location score
75+
Use this as a baseline before commercial discussions.
-
Footfall consistency
5 days/week
Avoid sites with highly irregular demand windows.
-
Service turnaround
< 24 hours
Escalation closure time strongly impacts repeat demand.
-
Monthly score variance
< 10%
Large swings often indicate unstable location quality.
Risk Controls
Common failure points and mitigations
-
Score looks strong but sales underperform
Run a two-week pilot with real sales logging before long-term lock-in.
-
High footfall but poor conversion
Audit product relevance, visibility, and payment convenience for that site.
-
Operational bottlenecks after launch
Pre-approve refill windows and service routing during site selection.
Execution Cadence
Suggested rollout rhythm after planning
-
Week 1
Site scoring and shortlist finalization
-
Week 2
Access, power, and safety validation
-
Week 3
Pilot launch and transaction tracking
-
Week 4
Re-score with actual usage data
-
Month 2
Scale/hold decision for next site
FAQ
Most common planning questions
Answers to the key questions teams ask before approving rollout plans.
What benchmark should I use before launch?
Use practical thresholds: realistic payback window, stable operating margin, and consistent serviceability at your target sites.
Should one metric decide the final decision?
No. Combine commercial metrics with operational checks such as access, refill frequency, and payment readiness before final approval.
When should I review or recalculate the plan?
Review after the first 30 days, and re-check whenever rent/commission, demand pattern, or operating cost changes materially.
Continue Planning
Build your complete planning stack
Most operators use 2-3 tools together before approval: location validation, economics modeling, and execution planning.
- Product Mix Planner Build a better vending assortment by balancing demand, margin, and spoilage risk.
- Profit Calculator Use this interactive calculator to estimate vending machine revenue, costs, ROI, and monthly net profit in minutes.
- Refill Planner Plan refill cadence and service workload so your machines stay available without overstocking.
- Vending Business Plan Generator Create a practical vending business plan in minutes with clear launch, operations, and growth recommendations.